What counts as "unbilled work"?
Short answer: Work your records prove happened, for which no invoice exists or the invoice is short of the recorded value. It is not unpaid invoices (that's receivables), not discounts you approved, and not warranty jobs that are $0 by policy.
The four kinds
1. The whole job that was never invoiced. A completed service call — tech on site, parts consumed, time logged — with no invoice at all. Usually a handoff failure: the tech finished at 6:40pm, the office closed the day, the job sat in "completed" without its billing step.
2. The part that never made it onto the bill. The invoice exists and looks right, but the compressor on the supplier statement never became a line. Labor got billed; the $780 part didn't. This is the most common and the least visible, because the invoice screen looks complete.
3. The hours that were logged but not billed. 6.5 hours on the job, 3.0 billed. Real on time-and-materials shops, and on flat-rate shops whenever someone bills "the standard call" for a job that ran long.
4. The fee that disappeared. Trip charge or diagnostic fee configured, job completed, fee absent from the invoice — with no repair approved that would legitimately waive it.
What it is not
- Unpaid invoices — those are accounts receivable. The invoice exists; the money hasn't arrived. Different problem, different tools.
- Discounts and goodwill credits — if the office approved them, they're decisions, not leaks.
- Warranty and callback jobs — $0 by policy. They're only a leak if your warranty claims aren't being filed, which is a different discipline.
- Monthly-billed accounts — builder and property-management work that rolls up at month-end is legitimate, if you have a list of those accounts.
Why it's a drift, not an event
Nobody loses $4,000 in one afternoon. The real pattern is: a $89 trip charge here, a $186 part there, a $332 half-day of unbilled labor, repeated across a month. Individually each item survives any audit question ("invoice looked right"). Collectively, in a 400-job month, it's thousands of dollars — typically 1–3% of revenue for a shop that has never reconciled.
A worked example
One September week at a 6-tech shop:
- Monday. Compressor swap, job #20418, complete at 5:10pm. Office closes the day with three jobs un-invoiced; this is one of them. The compressor is on Thursday's supplier statement. Result: $1,140 of recorded work, no invoice.
- Tuesday. Diagnostic + blower motor, job #20431. Invoice goes out for labor only — $176. The $310 motor never becomes a line. The invoice looks complete on its screen; the motor is only visible on the supplier statement.
- Wednesday. Trip charge $89, repair declined, customer leaves without paying anything. The waiver rule doesn't apply (no approved repair), but nobody notices. $89 gone.
- Thursday. 6.5 hours on the sheet, invoice billed at 3.0 hours × $95. $332.50 of labor logged, not billed.
Four findings in one week: $1,140 + $310 + $89 + $332.50 = $1,871.50. Nothing about any single day looks wrong from inside the scheduling board. That's what "drift, not event" means.
Common mistakes
- Counting unpaid invoices as unbilled work. The invoice exists — that's receivables, a different problem with different tools.
- Counting warranty or callback jobs. They're $0 by policy. Only unbilled policy work counts, which is why the $0 invoice convention matters.
- Counting approved discounts. If the office approved it and wrote it down, it's a decision, not a leak.
- Assuming a clean-looking invoice is complete. The invoice screen can't show you the part that never became a line — only the supplier statement can.
How you'd find it manually
Export completed jobs. Export invoices. Export the supplier statement. Match everything three ways: jobs to invoices, supplier lines to invoice lines, hours to billed hours. Anything unmatched, with no documented reason, is unbilled work. That's the whole discipline — it's just tedious enough that almost nobody does it every month.
Author: Unbilled. That tedium is the product: send three files, get the reconciliation as a one-page report with every item's evidence.